Completion Difficulties and Countermeasures for HPHT and Sour Gas Well
English

About The Book

According to the main completion technical difficulties of Longwangmiao HPHT acid gas reservoir a series of studies and field tests were mainly carried out including optimization of well completion modes experimental evaluation and optimization of string materials sealing performance evaluation of string threads structural optimization design of downhole pipe strings and erosion resistance evaluation of pipe strings. Field application results show that the erosion of high-flowrate production on pipe strings and downhole tools and the effect of perforation on the sealing performance of production packers were reduced effectively well completion quality was improved and annulus abnormal pressure during the late production was reduced. This research provides a reference for the development of similar gasfields.
Piracy-free
Piracy-free
Assured Quality
Assured Quality
Secure Transactions
Secure Transactions
Delivery Options
Please enter pincode to check delivery time.
*COD & Shipping Charges may apply on certain items.
Review final details at checkout.
downArrow

Details


LOOKING TO PLACE A BULK ORDER?CLICK HERE