Estimator's Piping Man-hours Tool
shared
This Book is Out of Stock!
English

About The Book

<p><strong style=color: rgba(32 33 36 1)>Eliminate uncertainty from your piping construction estimates.</strong></p><p><span style=color: rgba(32 33 36 1)>Are you a Cost Estimator Construction Manager Engineer (Mechanical Chemical or Petroleum) or a stakeholder in an EPC company? In major industrial projects an error in calculating welding and erection man-hours can mean the difference between a profitable project and a significant financial loss.</span></p><p><strong style=color: rgba(32 33 36 1)><em>Estimator's Piping Man-hours Tool</em></strong><span style=color: rgba(32 33 36 1)> is a direct technical guide designed to solve one of the most complex challenges in industrial construction: </span><strong style=color: rgba(32 33 36 1)>accurate man-hour estimation for piping in Gas Compressor Stations.</strong></p><p><strong style=color: rgba(32 33 36 1)>What you will find in this manual:</strong><span style=color: rgba(32 33 36 1)> Far from academic theory this book uses a </span><strong style=color: rgba(32 33 36 1)>real-world practical example</strong><span style=color: rgba(32 33 36 1)> to break down the methodology step-by-step teaching you how to structure professional calculations:</span></p><p></p><p><strong style=color: rgba(32 33 36 1)>Reliable Base Values:</strong><span style=color: rgba(32 33 36 1)> How to establish solid MH/DI (Man-Hours per Diameter Inch) standards for carbon steel.</span></p><p><strong style=color: rgba(32 33 36 1)>The Material Factor (API 5L):</strong><span style=color: rgba(32 33 36 1)> Discover how high-strength steel (X60/X70) and demanding welding procedures (preheat special electrodes) drastically impact productivity.</span></p><p><strong style=color: rgba(32 33 36 1)>The Cost of the Environment (Brownfield):</strong><span style=color: rgba(32 33 36 1)> Learn to quantify hours lost to Work Permits safety lockouts and the complexity of operating within existing live plants.</span></p><p><strong style=color: rgba(32 33 36 1)>NDE Valuation:</strong><span style=color: rgba(32 33 36 1)> A critical cost and time comparison between traditional Radiography (RT) and Phased Array Ultrasonic Testing (PAUT).</span></p><p><strong style=color: rgba(32 33 36 1)>Line Completion:</strong><span style=color: rgba(32 33 36 1)> Correct estimation for cleaning hydrostatic testing and pipe drying.</span></p><p><strong style=color: rgba(32 33 36 1)>Structured Methodology:</strong><span style=color: rgba(32 33 36 1)> A clear separation between direct labor and indirect labor (detailed in Annex A).</span></p><p><strong style=color: rgba(32 33 36 1)>Real-World Case Study:</strong><span style=color: rgba(32 33 36 1)> The book concludes with a detailed analysis of the fabrication and erection of a </span><strong style=color: rgba(32 33 36 1)>30'' spool</strong><span style=color: rgba(32 33 36 1)> applying all correction factors to visualize the real impact on execution times.</span></p><p><span style=color: rgba(32 33 36 1)>Stop relying on vague global factors. Use this tool to build solid budgets defend your estimates to clients with technical arguments and control actual productivity on-site.</span></p><p><strong style=color: rgba(32 33 36 1)>Add this resource to your technical library today.</strong></p><p></p><p></p>
Piracy-free
Piracy-free
Assured Quality
Assured Quality
Secure Transactions
Secure Transactions
*COD & Shipping Charges may apply on certain items.
Review final details at checkout.
2251
2475
9% OFF
Paperback
Out Of Stock
All inclusive*
downArrow

Details


LOOKING TO PLACE A BULK ORDER?CLICK HERE