Genetic Algorithms Based on Construction Management

About The Book

Today the need for proper planning is clear in order to correctly estimate the time and cost of the project and the amount of resources needed in a project which have a direct impact on the implementation administration and proper exploitation of projects such as dam and building construction. In general the management and planning of activities and resources required in a project requires various analyses one of which is modeling and correctly predicting the cost and time of the project. Achieving this goal significantly contributes to optimal project management and decision-making in specific situations. Dynamic site placement means identifying the optimal location for temporary equipment materials and other temporary tools and offices available on the construction site. The location of the site is classified as a dynamic problem because the required equipment as well as the needs of the project are constantly changing at different stages and throughout the life of the project.
Piracy-free
Piracy-free
Assured Quality
Assured Quality
Secure Transactions
Secure Transactions
Delivery Options
Please enter pincode to check delivery time.
*COD & Shipping Charges may apply on certain items.
Review final details at checkout.
downArrow

Details


LOOKING TO PLACE A BULK ORDER?CLICK HERE