Optimal allocation of resources in mining industry
shared
This Book is Out of Stock!
English

About The Book

The book has seven chapters starting with the introduction and followed by chapter two (literature review). Chapter two has detailed information about simulation optimization (DES optimizing productivity as a design to mine) and the changing duty cycles in haulage equipment. Chapter three focus on framework of the panel width optimization with the help of DES as a case study. This is mainly by theoretical approach. In chapter four incorporation of the changing equipment duty cycle is presented. Illustrations are also explained to determine optimal allocation of the shuttle-car to continuous minors like case of DRC where Gold mining has never ceased. Mathematical modeling of Room and Pilar as BILP formed solution is presented in chapter five. This is followed by chapter six to explore whether using heuristic approaches in pre-process of room and pillar sequencing due to BILP problem. Conclusions and recommendations are lastly presented in chapter seven of this book.
Piracy-free
Piracy-free
Assured Quality
Assured Quality
Secure Transactions
Secure Transactions
*COD & Shipping Charges may apply on certain items.
Review final details at checkout.
9393
9887
5% OFF
Paperback
Out Of Stock
All inclusive*
downArrow

Details


LOOKING TO PLACE A BULK ORDER?CLICK HERE