Optimal Substation Coverage for Phasor Measurement Unit Installations
English

About The Book

The Phasor Measurement Unit (PMU) has been found to carry great deal of value for applications in the wide area monitoring of power systems. Historically deployment of these devices has been limited by the prohibitive cost of the device itself. Therefore the objective of the conventional optimal PMU placement problem is to find the minimum number devices which if carefully placed throughout the network either maximize observability or completely observe subject to different constraints. Now due to improved technology and digital relays serving a dual use as relay & PMU the cost of the PMU device itself is not the largest portion of the deployment cost but rather the substation installation. This book presents a technique proposed to minimize the number of substation installations thus indirectly minimizing the synchrophasor deployment costs.
Piracy-free
Piracy-free
Assured Quality
Assured Quality
Secure Transactions
Secure Transactions
Delivery Options
Please enter pincode to check delivery time.
*COD & Shipping Charges may apply on certain items.
Review final details at checkout.
downArrow

Details


LOOKING TO PLACE A BULK ORDER?CLICK HERE