ENEO (formerly AES-SONEL) is a mixed economy company with 51% of its capital held by the Actis group 44% by the State of Cameroon and 5% for the personnel. During our internship for the University Diploma of Technology (DUT) at the thermal power plant ENEO Bertoua. Indeed during our internship there was a problem of water supply in the fire water tank hence the theme entitled Study of the automation of the filling system of the fire water tank whose main objectives are: to make automatic the filling of the fire water tank of 50m3 in order to have water permanently in the tank. It is also a question of being able to control the pump remotely by radio wave and to propose a maintenance plan. We used the automatic wireless control via a radio kit to have water permanently in the tank. Afterwards we established an alarm circuit built around a water level sensor (electric float) to signal the malfunction of the system. This project amounts to a total of 273 450 FCFA.
Piracy-free
Assured Quality
Secure Transactions
Delivery Options
Please enter pincode to check delivery time.
*COD & Shipping Charges may apply on certain items.