Time Based Development Planning of Distribution Networks

About The Book

In the book a time-based model for distribution network development planning is presented considering the possibility of using distributed energy generation technologies and the existence of capacitor banks. The proposed model specifies the appropriate location capacity and time for the use of distributed generation technologies and capacitor banks as well as the schedule for increasing the capacity of network lines. To solve the problem a genetically enhanced algorithm is used to optimize the network development plan including the time place and capacity of DG and capacitor banks in the distribution network as well as to optimize investment costs and operating costs. Also in order to validate and evaluate the efficiency of the proposed solution to solve the distribution network development planning problem on a 17-bus radial distribution network it was implemented in the MATLAB programming environment in a computer system.
Piracy-free
Piracy-free
Assured Quality
Assured Quality
Secure Transactions
Secure Transactions
Delivery Options
Please enter pincode to check delivery time.
*COD & Shipping Charges may apply on certain items.
Review final details at checkout.
downArrow

Details


LOOKING TO PLACE A BULK ORDER?CLICK HERE